
Add to Cart
In the construction of railway and highway bridges, preloading testing is a crucial step to guarantee the safety of bridge structures. The conventional approach of using sandbags for preloading presents challenges like handling difficulty, complex operation, and high expenses. However, our Pre pressure flexible tank, constructed via condensation force, boasts exceptional anti-swelling strength. Once filled with water, it offers substantial weight, effectively replacing the conventional method of sandbag preloading. This makes it a top choice for contemporary bridge construction.
Easy to transport: When the bag is empty, it is lightweight and easy to transport and handle, greatly reducing labor costs.
Easy to operate: Simply inject water to use, no need for complex equipment or technology, saving time and manpower.
Time and effort saving: Rapid water injection and drainage significantly improve construction efficiency and shorten the construction period.
Accurate testing: evenly distribute weight to ensure accurate and reliable preloading test data.
Low cost: Reusable, reducing material waste, and more economical for long-term use.
Reusable: High strength PVC material has strong durability and can be used multiple times, suitable for long-term project needs.
Safe and reliable: High tensile strength, not easily broken, ensuring construction safety.
Environmental innovation: replacing traditional sandbags, reducing environmental pollution, and in line with modern environmental construction concepts.
Why should you opt for our bridge pre pressure water tank?
Efficient construction: Our tanks are designed to significantly increase the efficiency of preloading testing, thereby reducing the construction period.
Cost reduction: By using our tanks, you can lower labor, material, and time costs, ultimately enhancing the economic benefits of your project.
Environmental safety: Our tanks comply with contemporary environmental construction standards, ensuring a safe and reliable construction process.
1. Railway bridge construction: This involves the utilization of bridge preloading testing to ensure the structural stability of the bridge.
2. Highway and bridge construction: In this context, sandbags are replaced with efficient and cost-effective preloading solutions.
3. The preloading technique can also be applied in other large-scale construction projects such as elevated bridges, overpasses, and more.